Private Client · Pembroke, Wales · 20th September, 2025

Restoring Water to a Drying Reed Bed

Tree clearance, ditching and bund construction to restore water levels across a drying reed bed at Pembroke Mill Pond.

Clearing the Route

At Pembroke Mill Pond, a large area of reed bed was drying out, becoming increasingly boggy and losing water. The solution was to create a bund around the area to help retain water and direct it back onto the reed bed. The project involved a small amount of reed cutting alongside extensive tree work and clearance. Overgrown trees and hedges had to be removed along the proposed route, creating a clear path for the bund to follow. Once the vegetation clearance was complete, the digging arm was attached and work could begin on the ditch and bund.
After habitat creation in Mill Pond
Before habitat creation in Mill Pond

Ditching and Bund Construction

The bund was constructed along a designated route extending several hundred metres through the overgrown area. Material was excavated to form the ditch and build up the bund, creating a continuous barrier around the reed bed. This helped to retain water and encourage it back across areas that had previously been drying out. The work required careful excavation through the cleared route while maintaining the surrounding landscape and existing habitat.
After habitat creation in Mill Pond
Before habitat creation in Mill Pond

Restoring the Reed Bed

Once the ditching and bund construction was complete, the newly formed earthworks were left to settle and naturally green over during the warmer months. The completed bund provided a means of retaining and directing water back onto the reed bed, helping to address the loss of water and improve conditions across the habitat. The project combined vegetation clearance, specialist ditching and earthworks to create a practical long-term solution for the drying reed bed.
After habitat creation in Mill Pond
Before habitat creation in Mill Pond

Related Projects

Similar Case Studies

Explore other projects where we have delivered similar waterway management work.

Canadian Pondweed Removal from a Castle Moat in South Wales

Canadian Pondweed Removal from a Castle Moat in South Wales

Cutting and clearing of large amounts of Canadian Pondweed (Elodea), Algae and Debris from various waterbodies around a prominent Castle in South Wales
Learn More

Need Similar Work?

Have a Similar Project?

If you're dealing with a similar waterway management problem, contact us to discuss your site and the most appropriate approach.